– ZEPLIN-III PICTURE GALLERY –

 

SURFACE COMMISSIONING

 

PMTs_grid1

Photomultiplier array covered by electrode grid

 

 

status_050428_2    status_050627_2

Left: Photomultiplier array assembled above cryogen reservoir.

Right: Xenon dome assembled over photomultiplier array.

 

 

Assembly of photomultiplier array

 

 

 

UNDERGROUND DEPLOYMENT

 

DSCF0122

Detector located on shielding section

 

 

DSCF0126

Detector sitting between the gas purification system (near side)

and the acquisition and control electronics (far side)

 

 

DSCF0011

Recommissioning the xenon gas handling system

 

 

DSCF0034

View of the Boulby Underground Laboratory

 

 

Z3InShield

Assembly of neutron shield

 

 

image035

Assembly of gamma shield

 

 

 

PHASE-II UPGRADES

 

Shield base

 

 

 

Upgrading the photomultiplier array

 

 

Screen_shot_2010-04-30_at_21_00_41

Assembling the anti-coincidence veto;

Left: Gd-loaded plastic; right: plastic scintillator modules

 

 

 

 

MISCELLANEOUS

 

   LXe Section   

 

Left: CAD cut-out showing detector copperwork;

Right: CAD of detector in veto/shield

 

 

P8290230b

The team