Period 0 DESY 2006: One set up with ECAL 230000- Period 1 CERN 2006: August, with ECAL 300000-300405 Period 2 CERN 2006: August, without ECAL 320545-320706, 310026? (Was there a rearrangement of the trigger scintillators and/or tracking chambers during the August period? If so, was this at the same time as removing the ECAL or not?) Period 3 CERN 2006: October, with ECAL 320707-321066, 300411-300755 Period 4 CERN 2006: October, without ECAL 321067-321111 CERN 2006: October, muons with ECAL 300757- (Same question on moving the other equipment as above. Was the ECAL shifted other than on its stage?) Periods 5-8 CERN 2007: With ECAL With ECAL and hodoscope Without ECAL and with hodoscope (Is it correct that all the HCAL-only runs had the hodoscope in front? Is it correct that the scintillators and tracker were not moved throughout this period?) Periods 9-10 May FNAL 2008: May, with SiW ECAL July, with SiW ECAL = exactly equivalent to above? July, without ECAL Sept, with ScW ECAL Sept, without ECAL = equivalent to July without ECAL? (Is it correct the hodoscope was never installed? Was there any HCAL-only running in May? Were the scintillators and chambers fixed throughout?) DC4 (not layer 4!) was reinstalled (backwards?) on 12/05/08. FNAL 2009: May, with ScW ECAL, 560000-560594 May, without ECAL, 580000-