WP1: Summary and Activities In FY2013/14
Highly urgent engineering (requested by KEK / J-PARC)
- Phase-I and II target and solenoid concept and design
- to allow interfaces with associated components to be defined for tendering process
- Facility space and shielding requirements
- to allow enough space for Phase-II (manipulators, extra shielding) to be secured for Phase-I construction
Urgent beam line modelling work
- needed by rest of collaboration for design finalisation
- detector and beam line optimisation
- software readiness for data and physics studies
Beam line detector physics design
- needs to be defined soon to coordinate with rest of COMET
Joint effort which requires accelerator physics, particle physics and engineering expertise to be coordinated