#acl All:read === About the IDS-NF === The principal objective of the International Design Study for the Neutrino Factory (the IDS-NF) is to deliver a design report in which: * The physics performance of the Neutrino Factory is detailed and the specification of each of the accelerator, diagnostic, and detector systems that make up the facility is defined; * The schedule for the implementation of the Neutrino Factory facility is presented; * The cost of the Neutrino Factory accelerator, the diagnostics, and the detector systems are presented at a level of accuracy appropriate for the report to inform a decision to initiate the Neutrino Factory project; and * The outstanding technical and financial uncertainties are documented and an appropriate uncertainty-mitigation plan is presented. This report, the Reference Design Report (RDR), is required in 2012/13. As a step on the way, an Interim Design Report (IDR) is required in 2010/11. The IDS is building on the success of the International Scoping Study of a future Neutrino Factory and super-beam facility ([[http://www.hep.ph.ic.ac.uk/iss/|ISS]]), which took place between June 2005 and August 2006. The baseline scenario defined by the ISS looks like: [[attachment:issBaseline.jpg|{{attachment:issBaseline-small.jpg}}]]