<?xml version="1.0" encoding="utf-8"?>
<rdf:RDF xmlns:wiki="http://purl.org/rss/1.0/modules/wiki/" xmlns="http://purl.org/rss/1.0/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:dc="http://purl.org/dc/elements/1.1/"><!--
    Add an "items=nnn" URL parameter to get more than the 
    default 15 items. You cannot get more than 
    100 items though.
    
    Add "unique=1" to get a list of changes where page names are unique,
    i.e. where only the latest change of each page is reflected.
    
    Add "diffs=1" to add change diffs to the description of each items.
    
    Add "ddiffs=1" to link directly to the diff (good for FeedReader).
    
    Add "lines=nnn" to change maximum number of diff/body lines 
    to show. Cannot be more than 100.
    
    Add "show_att=1" to show items related to attachments.
    
    Add "page=pattern" to show feed only for specific pages.
    Pattern can be empty (it would match to all pages), 
    can start with circumflex (it would be interpreted as 
    regular expression in this case), end with slash (for 
    getting feed for page tree) or point to specific page (if 
    none of the above can be applied).
    
    Current settings: items=15, unique=0, 
    diffs=1, ddiffs=1, lines=20, 
    show_att=1
-->
<channel rdf:about="https://idsnf.hep.ph.ic.ac.uk/wiki/"><title>IDS Wiki</title><link>https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan</link><description>RecentChanges at IDS Wiki</description><image rdf:resource="https://idsnf.hep.ph.ic.ac.uk/idswikidata/nufact.png"></image><items><rdf:Seq><rdf:li rdf:resource="https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan#20090522143429"></rdf:li><rdf:li rdf:resource="https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan#20081201204326"></rdf:li><rdf:li rdf:resource="https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan#20081201204300"></rdf:li><rdf:li rdf:resource="https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan#20081124145541"></rdf:li><rdf:li rdf:resource="https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan#20080611141224"></rdf:li><rdf:li rdf:resource="https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan#20080610165450"></rdf:li><rdf:li rdf:resource="https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan#20080610153600"></rdf:li><rdf:li rdf:resource="https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan#20080416205621"></rdf:li><rdf:li rdf:resource="https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan#20080416204608"></rdf:li><rdf:li rdf:resource="https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan#20080416203604"></rdf:li></rdf:Seq></items></channel><image rdf:about="https://idsnf.hep.ph.ic.ac.uk/idswikidata/nufact.png"><title>IDS Wiki</title><link>https://idsnf.hep.ph.ic.ac.uk/wiki/</link><url>https://idsnf.hep.ph.ic.ac.uk/idswikidata/nufact.png</url></image><item rdf:about="https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan#20090522143429"><title>FrontPage/Accelerator/Workplan</title><dc:date>2009-05-22T14:34:29Z</dc:date><link>https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan?action=diff&amp;rev1=10&amp;rev2=9</link><description>converted to 1.6 markup
&lt;pre&gt;
  #acl IDSAcceleratorAdminGroup:read,write IDSAcceleratorGroup:read IDSUsersGroup:read All:read
  = Work Plan =
- Also see the document [attachment:FrontPage/Documentation/IDS-NF-004-v1.0.pdf Initial Division of Repsonsibilities within the Accelerator Working Group]
+ Also see the document [[attachment:FrontPage/Documentation/IDS-NF-004-v1.0.pdf|Initial Division of Repsonsibilities within the Accelerator Working Group]]
   I. Proton Driver
-   A. Design of at least one proton driver system, with sufficient study to demonstrate that the specifications are met.  All components should be designed and simulated to a sufficient extent that there is general agreement that it would be possible to make them.[[BR]]
+   A. Design of at least one proton driver system, with sufficient study to demonstrate that the specifications are met.  All components should be designed and simulated to a sufficient extent that there is general agreement that it would be possible to make them.&amp;lt;&amp;lt;BR&amp;gt;&amp;gt;
    '''Deliverable:'''  Description of the facility.  Lattice designs and simulations for any non-standard components.
-   A. Design of additional proton driver systems, for cost and performance comparison.[[BR]]
+   A. Design of additional proton driver systems, for cost and performance comparison.&amp;lt;&amp;lt;BR&amp;gt;&amp;gt;
    '''Deliverable:''' Sufficient information for making comparison.
   I. Target [Coordinators: C. Densham (RAL), H. Kirk (BNL)]
-   A. Analysis of MERIT data to determine maximum length of proton driver bunch train before pion production is reduced.[[BR]]
+   A. Analysis of MERIT data to determine maximum length of proton driver bunch train before pion production is reduced.&amp;lt;&amp;lt;BR&amp;gt;&amp;gt;
-   '''Deliverable:''' Maximum bunch train length.[[BR]]
+   '''Deliverable:''' Maximum bunch train length.&amp;lt;&amp;lt;BR&amp;gt;&amp;gt;
-   '''Target date:''' June 2008.[[BR]]
+   '''Target date:''' June 2008.&amp;lt;&amp;lt;BR&amp;gt;&amp;gt;
    '''Responsible person:''' H. Kirk.
-   A. Engineering of target infrastructure.[[BR]]
...

&lt;/pre&gt;
</description><dc:contributor><rdf:Description wiki:host="localhost"><rdf:value>localhost</rdf:value></rdf:Description></dc:contributor><wiki:version>1243002869433474</wiki:version><wiki:status>updated</wiki:status><wiki:diff>https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan?action=diff</wiki:diff><wiki:history>https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan?action=info</wiki:history></item><item rdf:about="https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan#20081201204326"><title>FrontPage/Accelerator/Workplan</title><dc:date>2008-12-01T20:43:26Z</dc:date><link>https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan?action=diff&amp;rev1=9&amp;rev2=8</link><description>
&lt;pre&gt;
  #acl IDSAcceleratorAdminGroup:read,write IDSAcceleratorGroup:read IDSUsersGroup:read All:read
  = Work Plan =
- Also see the document [attachment:FronPage/Documentation/IDS-NF-004-v1.0.pdf Initial Division of Repsonsibilities within the Accelerator Working Group]
+ Also see the document [attachment:FrontPage/Documentation/IDS-NF-004-v1.0.pdf Initial Division of Repsonsibilities within the Accelerator Working Group]
   I. Proton Driver
    A. Design of at least one proton driver system, with sufficient study to demonstrate that the specifications are met.  All components should be designed and simulated to a sufficient extent that there is general agreement that it would be possible to make them.[[BR]]
    '''Deliverable:'''  Description of the facility.  Lattice designs and simulations for any non-standard components.
&lt;/pre&gt;
</description><dc:contributor><rdf:Description wiki:host="httpvipoutside.bnl.gov"><rdf:value>Self:scottBerg</rdf:value></rdf:Description></dc:contributor><wiki:version>1228164206000000</wiki:version><wiki:status>updated</wiki:status><wiki:diff>https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan?action=diff</wiki:diff><wiki:history>https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan?action=info</wiki:history></item><item rdf:about="https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan#20081201204300"><title>FrontPage/Accelerator/Workplan</title><dc:date>2008-12-01T20:43:00Z</dc:date><link>https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan?action=diff&amp;rev1=8&amp;rev2=7</link><description>
&lt;pre&gt;
  #acl IDSAcceleratorAdminGroup:read,write IDSAcceleratorGroup:read IDSUsersGroup:read All:read
  = Work Plan =
+ Also see the document [attachment:FronPage/Documentation/IDS-NF-004-v1.0.pdf Initial Division of Repsonsibilities within the Accelerator Working Group]
   I. Proton Driver
    A. Design of at least one proton driver system, with sufficient study to demonstrate that the specifications are met.  All components should be designed and simulated to a sufficient extent that there is general agreement that it would be possible to make them.[[BR]]
    '''Deliverable:'''  Description of the facility.  Lattice designs and simulations for any non-standard components.
&lt;/pre&gt;
</description><dc:contributor><rdf:Description wiki:host="httpvipoutside.bnl.gov"><rdf:value>Self:scottBerg</rdf:value></rdf:Description></dc:contributor><wiki:version>1228164180000000</wiki:version><wiki:status>updated</wiki:status><wiki:diff>https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan?action=diff</wiki:diff><wiki:history>https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan?action=info</wiki:history></item><item rdf:about="https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan#20081124145541"><title>FrontPage/Accelerator/Workplan</title><dc:date>2008-11-24T14:55:41Z</dc:date><link>https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan?action=diff&amp;rev1=7&amp;rev2=6</link><description>
&lt;pre&gt;
    '''Deliverable:'''  Description of the facility.  Lattice designs and simulations for any non-standard components.
    A. Design of additional proton driver systems, for cost and performance comparison.[[BR]]
    '''Deliverable:''' Sufficient information for making comparison.
-  I. Target
+  I. Target [Coordinators: C. Densham (RAL), H. Kirk (BNL)]
    A. Analysis of MERIT data to determine maximum length of proton driver bunch train before pion production is reduced.[[BR]]
    '''Deliverable:''' Maximum bunch train length.[[BR]]
    '''Target date:''' June 2008.[[BR]]
@@ -15, +15 @@

    A. Engineering of target infrastructure.[[BR]]
    '''Deliverable:''' Design details sufficient for costing.[[BR]]
    '''Responsible person:''' H. Kirk.
-  I. Front End
+  I. Front End [Coordinators: C. Rogers (ASTeC), D. Neuffer (Fermilab)]
    A. MUCOOL experiments studying relationship between magnetic fields on room-temperature 200&amp;amp;nbsp;MHz cavities, gradient in those cavities, and magnetic field orientation.[[BR]]
    '''Deliverable:'''  Paper describing relationship between maximum allowed magnetic fields, cavity gradients, and orientations.[[BR]]
    A. Re-design of front end to meet field requirements from III.A.
@@ -25, +25 @@

     1. Tracking through lattice.[[BR]]
     '''Deliverable:'''  Output from ICOOL tracking, analysis to determine transmission into accelerator acceptance.[[BR]]
...

&lt;/pre&gt;
</description><dc:contributor><rdf:Description wiki:host="httpvipoutside.bnl.gov"><rdf:value>Self:scottBerg</rdf:value></rdf:Description></dc:contributor><wiki:version>1227538541000000</wiki:version><wiki:status>updated</wiki:status><wiki:diff>https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan?action=diff</wiki:diff><wiki:history>https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan?action=info</wiki:history></item><item rdf:about="https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan#20080611141224"><title>FrontPage/Accelerator/Workplan</title><dc:date>2008-06-11T14:12:24Z</dc:date><link>https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan?action=diff&amp;rev1=6&amp;rev2=5</link><description>
&lt;pre&gt;
     '''Deliverable:''' Results demonstrating transmission and quantifying emittance growth for full transverse and longitudinal acceptance.[[BR]]
     '''Depends on:''' IV.B.1.[[BR]]
     1. Propagate distribution from normal-conducting accelerator[[BR]]
-    '''Deliverable:''' Output distribution, analysis of emittance growth and transmission.
+    '''Deliverable:''' Output distribution, analysis of emittance growth and transmission.[[BR]]
     '''Depends on:''' IV.A.2, IV.B.1.
    A. Dogbone RLAs.
     1. Mid-linac injection system, including all chromatic corrections.[[BR]]
&lt;/pre&gt;
</description><dc:contributor><rdf:Description wiki:host="jsberg-d820.dhcp.fnal.gov"><rdf:value>Self:scottBerg</rdf:value></rdf:Description></dc:contributor><wiki:version>1213193544000000</wiki:version><wiki:status>updated</wiki:status><wiki:diff>https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan?action=diff</wiki:diff><wiki:history>https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan?action=info</wiki:history></item><item rdf:about="https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan#20080610165450"><title>FrontPage/Accelerator/Workplan</title><dc:date>2008-06-10T16:54:50Z</dc:date><link>https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan?action=diff&amp;rev1=5&amp;rev2=4</link><description>
&lt;pre&gt;
  #acl IDSAcceleratorAdminGroup:read,write IDSAcceleratorGroup:read IDSUsersGroup:read All:read
- = Work Plan (Not Finished!) =
+ = Work Plan =
-   I. Proton Driver
+  I. Proton Driver
-     A. Design of at least one proton driver system, with sufficient study to demonstrate that the specifications are met.  All components should be designed and simulated to a sufficient extent that there is general agreement that it would be possible to make them.
+   A. Design of at least one proton driver system, with sufficient study to demonstrate that the specifications are met.  All components should be designed and simulated to a sufficient extent that there is general agreement that it would be possible to make them.[[BR]]
-     '''Deliverable:'''  Description of the facility.  Lattice designs and simulations for any non-standard components.
+   '''Deliverable:'''  Description of the facility.  Lattice designs and simulations for any non-standard components.
-     A. Design of additional proton driver systems, for cost and performance comparison.
+   A. Design of additional proton driver systems, for cost and performance comparison.[[BR]]
-     '''Deliverable:''' Sufficient information for making comparison.
+   '''Deliverable:''' Sufficient information for making comparison.
-   I. Target
+  I. Target
-     A. Analysis of MERIT data to determine maximum length of proton driver bunch train before pion production is reduced.
+   A. Analysis of MERIT data to determine maximum length of proton driver bunch train before pion production is reduced.[[BR]]
-     '''Deliverable:''' Maximum bunch train length.[[BR]]
+   '''Deliverable:''' Maximum bunch train length.[[BR]]
-     '''Target date:''' June 2008.[[BR]]
...

&lt;/pre&gt;
</description><dc:contributor><rdf:Description wiki:host="jsberg-d820.dhcp.fnal.gov"><rdf:value>Self:scottBerg</rdf:value></rdf:Description></dc:contributor><wiki:version>1213116890000000</wiki:version><wiki:status>updated</wiki:status><wiki:diff>https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan?action=diff</wiki:diff><wiki:history>https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan?action=info</wiki:history></item><item rdf:about="https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan#20080610153600"><title>FrontPage/Accelerator/Workplan</title><dc:date>2008-06-10T15:36:00Z</dc:date><link>https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan?action=diff&amp;rev1=4&amp;rev2=3</link><description>
&lt;pre&gt;
  #acl IDSAcceleratorAdminGroup:read,write IDSAcceleratorGroup:read IDSUsersGroup:read All:read
+ = Work Plan (Not Finished!) =
+   I. Proton Driver
+     A. Design of at least one proton driver system, with sufficient study to demonstrate that the specifications are met.  All components should be designed and simulated to a sufficient extent that there is general agreement that it would be possible to make them.
+     '''Deliverable:'''  Description of the facility.  Lattice designs and simulations for any non-standard components.
+     A. Design of additional proton driver systems, for cost and performance comparison.
+     '''Deliverable:''' Sufficient information for making comparison.
+   I. Target
+     A. Analysis of MERIT data to determine maximum length of proton driver bunch train before pion production is reduced.
+     '''Deliverable:''' Maximum bunch train length.[[BR]]
+     '''Target date:''' June 2008.[[BR]]
+     '''Responsible person:''' H. Kirk.
+     A. Engineering of target infrastructure.
+     '''Deliverable:''' Design details sufficient for costing.[[BR]]
+     '''Responsible person:''' H. Kirk.
  
&lt;/pre&gt;
</description><dc:contributor><rdf:Description wiki:host="jsberg-d820.dhcp.fnal.gov"><rdf:value>Self:scottBerg</rdf:value></rdf:Description></dc:contributor><wiki:version>1213112160000000</wiki:version><wiki:status>updated</wiki:status><wiki:diff>https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan?action=diff</wiki:diff><wiki:history>https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan?action=info</wiki:history></item><item rdf:about="https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan#20080416205621"><title>FrontPage/Accelerator/Workplan</title><dc:date>2008-04-16T20:56:21Z</dc:date><link>https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan?action=diff&amp;rev1=3&amp;rev2=2</link><description>
&lt;pre&gt;
- #acl IDSAcceleratorAdminGroup:read,write IDSAcceleratorGroup:read IDSUsersGroup:read 
+ #acl IDSAcceleratorAdminGroup:read,write IDSAcceleratorGroup:read IDSUsersGroup:read All:read
  
&lt;/pre&gt;
</description><dc:contributor><rdf:Description wiki:host="ic-jmqjm95lrzl1.dhcp.fnal.gov"><rdf:value>Self:ajitKurup</rdf:value></rdf:Description></dc:contributor><wiki:version>1208379381000000</wiki:version><wiki:status>updated</wiki:status><wiki:diff>https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan?action=diff</wiki:diff><wiki:history>https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan?action=info</wiki:history></item><item rdf:about="https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan#20080416204608"><title>FrontPage/Accelerator/Workplan</title><dc:date>2008-04-16T20:46:08Z</dc:date><link>https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan?action=diff&amp;rev1=2&amp;rev2=1</link><description>
&lt;pre&gt;
- #acl IDSAcceleratorAdmin:read,write IDSAcceleratorGroup:read IDSUsersGroup:read 
+ #acl IDSAcceleratorAdminGroup:read,write IDSAcceleratorGroup:read IDSUsersGroup:read 
  
&lt;/pre&gt;
</description><dc:contributor><rdf:Description wiki:host="ic-jmqjm95lrzl1.dhcp.fnal.gov"><rdf:value>Self:ajitKurup</rdf:value></rdf:Description></dc:contributor><wiki:version>1208378768000000</wiki:version><wiki:status>updated</wiki:status><wiki:diff>https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan?action=diff</wiki:diff><wiki:history>https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan?action=info</wiki:history></item><item rdf:about="https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan#20080416203604"><title>FrontPage/Accelerator/Workplan</title><dc:date>2008-04-16T20:36:04Z</dc:date><link>https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan?action=recall&amp;rev=1</link><description>New page:

&lt;pre&gt;
#acl IDSAcceleratorAdmin:read,write IDSAcceleratorGroup:read IDSUsersGroup:read 

&lt;/pre&gt;
</description><dc:contributor><rdf:Description wiki:host="ic-jmqjm95lrzl1.dhcp.fnal.gov"><rdf:value>Self:ajitKurup</rdf:value></rdf:Description></dc:contributor><wiki:version>1208378164000000</wiki:version><wiki:status>updated</wiki:status><wiki:diff>https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan?action=diff</wiki:diff><wiki:history>https://idsnf.hep.ph.ic.ac.uk/wiki/FrontPage/Accelerator/Workplan?action=info</wiki:history></item></rdf:RDF>