#acl IDSSteerGroup:read,write IDSUsersGroup:read All:read == Interim Design Report: document history page == === IDS-NF IDR version history === <> || '''Version''' || '''Date posted''' || '''File name''' || '''Tar ball''' || '''Comments''' || || 1.0 || 19Mar11 || <> || <> || Submitted to the ECFA neutrino panel. || || 2.0 || 19Oct11 || <> || <> || Published as a BNL, CERN, EUROnu, FERMILAB and RAL notes. [[http://lanl.arxiv.org/abs/1112.2853v1|arXiv:1112.2853v1 [hep-ex] ]] <
> [[http://cdsweb.cern.ch/record/1406857/files/pecfa-11-273_Report_Neutrino.pdf| ECFA Panel report]]|| || 2.1 || || <> || || EUROnu WP3 note number corrected. || === Specification for the IDR === The 'specifications' for the report, discussed at the 5th IDS-NF Plenary meeting and agreed within the Steering Group are: * Self-contained, consistent summary of the physics case for the Neutrino Factory and a concise explanation of the baseline for the accelerator complex and neutrino detectors. The IDR should be supported where appropriate by detailed technical reports published as IDS-NF (EUROnu) notes. Of course, it may be appropriate to publish some of these reports as papers in their own right. The IDR should include an extended bibliography of the associated technical reports; * Alternatives to the baseline, limited in number, will be described briefly in the IDR. Additional details should be provided in an Appendix to the report or a separate IDS-NF note/publication; * The costing for the IDR will be presented in an Appendix with a summary of the results of the costing being contained in the main report.