Tuesday, October 18, 2011

Accelerator WG Session 1: 09:00 to 10:30, Ballston Room
Baseline Design Progress: Proton Driver and Target
Session chair: TBD

09:00

Proton Driver at CERN (ppt )

S. Gilardoni

09:15

Proton Driver at Fermilab (pptx )

K. Gollwitzer

09:30

Proton Driver at RAL (ppt )

J. Pasternak

09:45

Proton Driver Bunch Compression (pptx )

L. Jenner

10:00

Low Energy Acceleration (ppt )

S. A. Bogacz

Accelerator WG Session 2: 11:00 to 13:00, Ballston Room
Progress on the Baseline Design
Session chair: TBD

11:00

Updated Target Station Design (ppt )

H. Kirk

11:40

Management of Energy Deposition in the Front End (pptx )

D. Neuffer

12:05

Magnetic Field Reduction at the RF Cavities using Bucked Coils (pdf )

A. Alekou

12:20

FFAG (ppt )

J. Pasternak

12:40

Decay Ring (pdf )

D. Kelliher

Accelerator WG Session 3: 14:00 to 15:30, Ballston Room
Costing
Session chair: TBD

14:00

Costing: How to do it, and Status (pptx )

A. Kurup

14:40

Muon Acceleration Technolgy and Building Concepts (ppt )

N. Bliss

15:15

Muon Decay Ring Technolgy and Building Concepts (pptx )

N. Collomb

Accelerator WG Session 4: 16:00 to 18:00, Ballston Room
Costing (cont.) and Low Energy Neutrino Factory
Session chair: TBD

16:00

Costing Discussion

16:30

Low Energy Neutrino Factory: What do we Mean? (ppt )

A. Bross

16:45

Multi(Few)-GeV Muon Storage/Decay Ring at Fermilab (ppt )

M. Popovic

17:00

Accelerator Modifications for a Low Energy Neutrino Factory (Discussion)



Files Page

VTECH-2011-10-17/Agenda/Accelerator (last edited 2011-10-18 18:54:54 by scottBerg)