Tuesday 9 October 2012
Accelerator WG Session 1: 09:00 to 10:30, Room WH3 NW
Front End
09:00 |
Experimental Results on RF Cavities (pdf ) |
B. Freemire |
09:30 |
Capture Reoptimization Following Chicane (pptx ) |
D. Neuffer |
10:00 |
Bucked Cooling Channel, Baseline Modifications (pdf ) |
D. Stratakis |
Accelerator WG Session 2: 11:00 to 12:30, Room WH3 NW
Front End; Engineering Update
11:00 |
Shielded Cooling Channel, plan to RDR(pdf ) |
C. Rogers |
11:30 |
Engineering: Overview and Status (pptx ) |
N. Collomb |
12:00 |
Engineering of the FFAG Ring (ppt ) |
T. Jones |
Accelerator WG Session 3: 13:30 to 15:00, Room WH3 NW
Proton Driver and Target
13:30 |
Target: Snapshot for Baseline (ppt ) |
H. Kirk |
14:00 |
Proton Drivers for IDS-NF (pptx ) |
K. Gollwitzer |
14:25 |
Transport Line to Target (pdf ) |
J. Pasternak |
14:40 |
Decay Ring (pdf ) |
J. Pasternak |
Accelerator WG Session 4: 15:30 to 17:00, Room WH3 NW
Acceleration
15:30 |
Acceleration Baseline and FFAG Design (pdf ) |
J. S. Berg |
16:00 |
Linac and RLA to 5 GeV (ppt ) |
A. Bogacz |
16:30 |
FFAG Details (pdf ) |
J. Pasternak |